FAQ: If I have adaptor dimer in my finished library, can I perform another bead cleanup to remove it?

Yes, bring the volume up to 100 µl with water or 1X TE and perform steps 1.12.1-1.12.20 in the NEBNext Direct Custom Ready Panel manual.